💡Interactive Mockups — Final UI will be customized during implementation based on HPL requirements
PHASE 1: MDM + Integrated WFM • 6 Months
MDM Platform - Interactive Preview
Click on different screens to explore the MDM platform interface.
⚡ HPL MDM Platform v1.0
🔔 12 new alerts
Rajesh Kumar
System Administrator
RK
📊 Dashboard
Meter Operations
⚡ Meter Management
🔍 Meter Lookup
✅ VEE Processing
Monitoring
🔔 Alerts & Events
🌎 Geographic View
Data & Reports
📄 Reports
💰 Billing Export
System
⚙ Administration
🔗 Integrations
Operations Dashboard
Total Meters
1,24,500
+2,340 this month
Online Now
1,21,832
97.8% connectivity
VEE Pass Rate
99.2%
+0.3% vs last week
Active Alerts
47
12 critical
Today's Energy
8.4 GWh
+3.2% vs yesterday
Energy Consumption Trend
DayWeekMonth
MonTueWedThuFriSatSun
Meter Status
■ Online: 97.8%
■ Offline: 1.4%
■ Fault: 0.8%
System Health
● API Gateway: OK
● Database: OK
● HES Adapter: OK
● Queue: High
Meter Management
All (1,24,500)Online (1,21,832)Offline (1,743)Tamper (47)New (234)
Meter ID
Consumer Name
Location
Type
Status
Last Reading
Actions
HP234521
Sharma Enterprises
Sector 14, Gurugram
Commercial
Online
4,521.45 kWh
View
HP234522
Rajesh Kumar
Sector 22, Gurugram
Residential
Online
1,234.20 kWh
View
HP234523
ABC Industries
IMT Manesar
Industrial
Tamper
45,678.90 kWh
View
HP234524
Green Valley Apartments
Sector 56, Gurugram
Residential
Offline
2,890.15 kWh
View
HP234525
Tech Park Mall
Cyber City
Commercial
Online
89,234.00 kWh
View
Showing 1-50 of 1,24,500 meters
← Prev123...2490Next →
Meter Details - HP234521
Meter Information
Meter ID
HP234521
Consumer ID
CON-2024-45678
Consumer Name
Sharma Enterprises
Category
Commercial - LT
Location
Sector 14, Gurugram
Installation Date
15 Jan 2024
Meter Make
HPL - SM301
Firmware
v2.4.1
Current Status
Status
Online
Last Comm
2 min ago
Current Reading
4,521.45 kWh
Current Load
12.4 kW
Consumption History (Last 30 Days)
DailyWeeklyMonthly
HES Commands
Last Command: On-Demand Read
Status: Success | 2 min ago
VEE Processing Engine
Readings Processed
2.4M
Last 24 hours
Validation Pass
99.2%
+0.3% vs last week
Estimated
0.6%
Auto-filled gaps
Exceptions
0.2%
Pending review
Active Validation Rules
Range Validation
Active
Check if reading is within min/max bounds
2.1M
Checked
99.8%
Passed
4,200
Failed
Spike Detection
Active
Flag readings >200% of average
2.1M
Checked
99.5%
Passed
10,500
Flagged
Zero Consumption
Active
Detect meters with no usage
2.1M
Checked
98.9%
Passed
23,100
Flagged
Processing Pipeline
Data Ingestion100%
Validation94%
Estimation78%
Billing Export100%
Alerts & Events
Critical
12
⚠
Warning
23
⚠
Info
12
ℹ
Resolved Today
45
✓
⚠
Meter Tamper Detected - Cover Open
Meter HP234521 at Sector 14, Gurugram has reported cover open event
2 minutes ago
⚠
Magnetic Tamper Alert
Meter HP198234 at IMT Manesar detected magnetic interference
8 minutes ago
⚠
Communication Loss - DCU #45
23 meters in Zone 4 are not communicating. Last seen 45 minutes ago.
15 minutes ago
ℹ
Unusual Load Pattern Detected
Zone 7 showing 40% higher consumption compared to baseline
32 minutes ago
Reports
📄
Energy Summary
Daily/Weekly/Monthly
Generate →
⚠
Tamper Report
All tamper events
Generate →
✅
VEE Summary
Validation statistics
Generate →
📈
AT&C Loss Report
Loss analysis by zone
Generate →
🔗
HES Communication
Connectivity stats
Generate →
📝
RDSS Compliance
Regulatory format
Generate →
Recent Reports
Report Name
Type
Generated
Generated By
Format
Actions
Energy Summary - Feb 2026
Energy
Today, 09:30 AM
System (Scheduled)
PDF, Excel
Download
Weekly Tamper Report
Tamper
Yesterday, 06:00 AM
System (Scheduled)
PDF
Download
Zone 4 Analysis
Custom
Feb 10, 2026
Rajesh Kumar
Excel
Download
Billing Data Export
Current Billing Cycle
Feb 2026
01 Feb - 28 Feb
Meters in Cycle
1,24,500
100% coverage
VEE Validated
1,23,456
99.2% pass rate
Ready for Billing
1,22,890
610 pending review
Export Configuration
Billing Period
Consumer Category
Export Format
CSVExcelXMLJSON
Data Fields
Recent Exports
Jan 2026 - All Categories
124,500 records | CSV
Download
Jan 2026 - Industrial
8,234 records | Excel
Download
Dec 2025 - All Categories
122,890 records | CSV
Download
Scheduled Exports
Monthly Billing Export
1st of every month | CSV | All Categories
Daily Consumption Summary
Daily 6:00 AM | CSV | All Categories
Geographic View
Legend
Online
Alert
Gurugram District
1,24,500 meters | 47 alerts
Administration
👥
User Management
24 active users
Manage →
🔑
Roles & Permissions
5 roles configured
Configure →
🔗
HES Integration
2 HES connected
Configure →
⚙
System Settings
General configuration
Configure →
🔔
Alert Rules
12 rules active
Configure →
📄
Audit Logs
System activity
View →
PHASE 1: MDM + Integrated WFM • 6 Months
Consumer Portal & App (RDSS Required)
Consumer-facing web portal and mobile app for usage visibility, bill payment, outage notifications, and prepaid recharge.
🌐 Consumer Web Portal
consumer.hplelec.com
⚡HPL Electric
👤 Ramesh SharmaCA No: 4521893
Current Month Usage
245 kWh
▲ 12% vs last month
Estimated Bill
₹1,850
Daily Usage (Last 7 days)
💰 Due in 5 days
₹1,650
Bill for January 2026
Quick Actions
📄 Bills
📝 Request
🔔 Alerts
📞 Support
📱 Consumer Mobile App
📈 My Usage
245 kWh
This Month
₹1,850
Est. Bill
5 days
Due in
💰 Pay Bill
Usage Dashboard
💰 Pay Bill
Amount Due
₹1,650
Select Payment Method
💳 UPI
💳 Card
🏢 Net Banking
Bill Payment
💳 Prepaid Balance
Available Balance
₹450
~3 days remaining
⚠ Low balance - Recharge soon
+ Recharge Now
Prepaid Recharge
🔔 Notifications
OUTAGE ALERT
Power outage in your area
Expected: 2 hrs
BILL GENERATED
Jan bill: ₹1,650
PAYMENT RECEIVED
₹1,450 on 15 Jan
Notifications
PHASE 1: MDM + Integrated WFM • 6 Months
Field Operations Mobile App
Companion mobile app for field crews with meter lookup, alert management, and site verification capabilities.
📊 Dashboard
124.5K
Meters
97.8%
Online
⚠ 12 Critical Alerts
Executive View
🔔 Meter Alerts
TAMPER ALERT
#HP234521 - Cover Open
COMM LOSS
#HP198234 - Offline 2hrs
LOW VOLTAGE
#HP345123 - 180V
View All Alerts (12)
Alerts View
🔍 Meter Scan
Meter ID
#HP234521
Status
Online
Last Read
2m ago
Current Reading
4,521.45 kWh
Meter Lookup
📷 Site Capture
📷 Photo Preview
Notes
Meter installed correctly...
✓ Submit
Site Verification
PHASE 1: Field Operations • 6 Months
O&M Mobile App (Operations & Maintenance)
Mobile app for O&M teams with work order management, meter lifecycle tracking, and preventive maintenance scheduling.
📋 Work Orders
12
Pending
3
Urgent
WO-2456
Urgent
Meter Replacement
WO-2457
Normal
Site Inspection
Work Orders
⚡ Asset Lifecycle
HP234521
Current Stage
✓
Procurement
✓
Warehouse
✓
Installation
●
Active
Maintenance
7-Stage Lifecycle
📅 Maintenance
TODAY
Zone 4 - Preventive
23 meters scheduled
TOMORROW
Zone 7 - Inspection
15 meters scheduled
MAR 25
DCU Maintenance
5 DCUs scheduled
Schedule View
📝 Report Issue
Meter ID
HP234521
Issue Type
Display Malfunction
📷 Attach Photo
Submit Report
Issue Reporting
PHASE 1: Field Operations • 6 Months
Utility Mobile App (Admin & Management)
Mobile app for utility administrators with KPI monitoring, crew management, escalation handling, and real-time analytics.
📊 KPI Dashboard
97.8%
Connectivity
99.2%
VEE Pass
AT&C Loss
12.4%
▼ 2.1% vs last month
Collection Efficiency
94.5%
KPI Overview
👥 Crew Status
8
Active
2
Break
2
Off
Team Alpha
Zone 4
Team Beta
Zone 7
Team Gamma
IMT Manesar
Crew Management
🚨 Escalations
CRITICAL
15 min ago
Mass outage Zone 4
HIGH
1 hr ago
DCU comm failure
MEDIUM
2 hrs ago
Pending work orders
Escalation Queue
⚙ Quick Actions
🔄
Disconnect
🔗
Reconnect
🔍
On-Demand
📝
Create WO
📄 View Reports
Admin Controls
PHASE 1: Field Operations • 6 Months
WFM Platform - Interactive Preview
Click on different screens to explore the WFM platform interface. Complete workforce management with 7-stage meter lifecycle, work orders, crew scheduling, inventory, and preventive maintenance.
⚙ HPL WFM Platform v1.0
🔔 8 pending approvals
Rajesh Kumar
WFM Administrator
RK
📊 Dashboard
Work Management
📋 Work Orders
📅 Scheduling
Asset Management
⚡ Asset Lifecycle
📦 Inventory
Resources
👥 Crew Management
🌎 Field Tracking
Analytics
📄 Reports
⚙ Administration
Operations Dashboard
Total Assets
1,24,500
+2,340 this month
Active Work Orders
234
18 overdue
Field Crews Active
8/12
4 on break/leave
Pending Installs
456
89 scheduled today
Completion Rate
94.2%
+3.1% vs last week
7-Stage Meter Lifecycle Pipeline
AllThis Month
2,340
Procured
→
1,890
Warehouse
→
456
In Transit
→
234
Installing
→
1,18,500
Active
→
567
Maint.
→
123
Replace
→
234
Retired
→
156
Disposed
Work Order Summary
18
Urgent
45
In Progress
171
Scheduled
1,234
Completed
Crew Status
■ Active: 8 crews
■ On Break: 2 crews
■ Off Duty: 2 crews
Work Order Management
All (234)Urgent (18)In Progress (45)Scheduled (171)Overdue (12)
Work Order ID
Type
Asset/Location
Assigned Crew
Priority
Status
Due Date
Actions
WO-2456
Meter Replacement
HP234521 - Sector 14
Team Alpha
Urgent
In Progress
Today
View
WO-2457
New Installation
Zone 7, Block C
Team Beta
Normal
In Progress
Tomorrow
View
WO-2458
Site Inspection
IMT Manesar
Team Gamma
Normal
Scheduled
Mar 25
View
WO-2459
Preventive Maintenance
DCU #45, Zone 4
Team Delta
Medium
Scheduled
Mar 26
View
WO-2460
Tamper Investigation
HP198234 - IMT
Team Alpha
Urgent
Overdue
Yesterday
View
Showing 1-50 of 234 work orders
← Prev123Next →
Asset Lifecycle Management
7-Stage Lifecycle Overview
2,340
assets
1. Procurement
PO received
1,890
assets
2. Warehouse
QC passed
456
assets
3. In Transit
To field
234
assets
4. Installation
In progress
1,18,500
assets
5. Active
In service
567
assets
6. Maintenance
Under repair
123
assets
7. Replacement
EOL reached
234
assets
8. Retired
Decommissioned
156
assets
9. Disposed
E-waste
Asset Details - HP234521
Asset ID
HP234521
Current Stage
5. Active
Type
Smart Meter - 3 Phase
Make/Model
HPL SM-301
Procurement Date
15 Nov 2025
Installation Date
20 Jan 2026
Warranty Expiry
20 Jan 2031
Location
Sector 14, Gurugram
Lifecycle History
✓
Stage 5: Active
20 Jan 2026 - Present
✓
Stage 4: Installation
18 Jan - 20 Jan 2026
✓
Stage 3: In Transit
15 Jan - 18 Jan 2026
✓
Stage 1-2: Procurement & QC
15 Nov 2025 - 15 Jan 2026
Crew Management
Total Crews
12
👥
Active Now
8
✅
On Break
2
☕
Off Duty
2
😴
Crew Name
Team Lead
Members
Current Zone
Status
Active WO
Today's Tasks
Actions
Team Alpha
Suresh Yadav
4
Zone 4, Sector 14
Active
WO-2456
5/8 completed
Track
Team Beta
Amit Singh
3
Zone 7, Block C
Active
WO-2457
3/6 completed
Track
Team Gamma
Ravi Kumar
4
IMT Manesar
On Break
-
2/5 completed
Track
Team Delta
Manoj Sharma
3
Cyber City
Active
WO-2459
4/7 completed
Track
Team Echo
Vikram Joshi
4
-
Off Duty
-
-
-
Inventory Management
Smart Meters (3-Phase)
1,890
In stock
Smart Meters (1-Phase)
2,340
In stock
DCU Units
45
Low stock
CT/PT Units
23
Reorder needed
Inventory by Warehouse
Item
SKU
Central WH
Zone 4 WH
Zone 7 WH
In Transit
Total
Status
Smart Meter 3-Phase
SM-3P-301
890
450
350
200
1,890
OK
Smart Meter 1-Phase
SM-1P-201
1,200
560
380
200
2,340
OK
Data Concentrator Unit
DCU-500
20
12
8
5
45
Low
CT/PT Combo Unit
CTPT-100
10
8
5
0
23
Reorder
Communication Module
CM-RF-01
150
80
70
50
350
OK
Work Scheduling
Weekly Schedule - March 2026
Mon 17
Tue 18
Wed 19
Thu 20
Fri 21
Sat 22
Sun 23
Alpha
Zone 4 12 tasks
Zone 4 10 tasks
Zone 7 8 tasks
IMT Urgent
Zone 4 8 tasks
Off
Off
Beta
Zone 7 10 tasks
Zone 7 12 tasks
Zone 4 9 tasks
Zone 7 6 tasks
Zone 7 6 tasks
Off
Off
Gamma
IMT PM tasks
IMT PM tasks
IMT PM tasks
Training
IMT 5 tasks
Off
Off
Today's Schedule Summary
New Installations45 scheduled
Meter Replacements12 scheduled
Site Inspections23 scheduled
Preventive Maintenance9 scheduled
Resource Utilization
Team Alpha87%
Team Beta72%
Team Gamma65%
WFM Reports
📋
Work Order Summary
Daily/Weekly/Monthly
Generate →
👥
Crew Performance
Productivity metrics
Generate →
⚡
Asset Lifecycle
Stage transitions
Generate →
📦
Inventory Status
Stock levels
Generate →
📅
SLA Compliance
Response times
Generate →
📈
Installation Progress
Deployment tracking
Generate →
Administration
👥
User Management
32 active users
Manage →
🔑
Roles & Permissions
6 roles configured
Configure →
🔗
MDM Integration
Connected
Configure →
⚙
Workflow Rules
18 rules active
Configure →
🔔
Escalation Rules
SLA configurations
Configure →
📄
Audit Logs
System activity
View →
PHASE 1: Report Builder • 6 Months
Custom Report Builder
User-friendly tabular report builder - select columns, apply filters, sort data, save configurations, and export to Excel/PDF/CSV.
reports.hplelec.com/builder
📁 Saved Reports
Monthly Consumption
Last edited: 2 days ago
Meter Status Report
Last edited: 5 days ago
Billing Summary
Last edited: 1 week ago
Tamper Events
Last edited: 2 weeks ago
+ New Report
Monthly Consumption Report
💾 Save📄 Excel📄 PDF
Selected Columns (drag to reorder)
☰ Meter ID☰ Consumer Name☰ Zone☰ Consumption (kWh)☰ Bill Amount+ Add Column
Filters Applied
Date: Mar 1-31, 2026 ✕Zone: North ✕Category: Domestic ✕+ Add Filter
Meter ID ↑
Consumer Name
Zone
Consumption
Bill Amount
HP234521
Rajesh Kumar
North
342 kWh
₹2,450
HP234522
Priya Sharma
North
285 kWh
₹2,040
HP234523
Amit Verma
North
456 kWh
₹3,270
HP234524
Sunita Devi
North
198 kWh
₹1,420
Showing 1-4 of 1,234 records
←123...→
Data Source
Available Columns
Sort By
▶ Run Report
PHASE 2: NILM + AI • Future Scope
NILM Platform - AI Appliance Disaggregation
AI-powered Non-Intrusive Load Monitoring (NILM) that identifies appliance-level energy usage from smart meter data alone — no additional sensors required.
nilm.hplelec.com
🤖 NILM Analytics Dashboard
AI-PoweredLast 24 hrs
Meters Analyzed
98,500
79% coverage
Model Accuracy
88-95%
Major appliances
Appliance Types
15+
Signatures trained
Theft Patterns
23
Flagged for review
DSM Potential
12.4%
Peak reduction
Aggregate Appliance Distribution (All Meters)
8.4
GWh/day
■ AC / Cooling35%
■ Water Heater20%
■ Refrigerator15%
■ Fans & Lighting12%
■ TV & Entertainment8%
■ Others10%
🚨 Anomaly & Theft Detection
Potential Theft - AC Running, Low Bill
Critical
HP234521 - AC signature detected but monthly bill only ₹200
Category Mismatch
Warning
HP198234 - Industrial load on domestic connection
Appliance Fault Detected
Info
HP345678 - Refrigerator running 40% more than normal